项 目 介 绍
Project introduction
本工程为地铁17号线香河园站建站膜结构封闭防尘棚工程,结构形式属于典型的骨架支承式膜结构。封闭场地轮廓长80米,宽40米,结构总高度为22米。防尘棚四周墙膜封闭到5.2米标高位置,5.2米标高以下用彩钢板封闭。四周墙下方留通道门洞。屋顶膜分为7个独立膜单元,四周山墙膜分为20个独立膜单元,其中最大膜单元的展开面积约515平米。
Construction project of closed dustproof shed in Xianghe garden subway station
The project is a closed membrane dustproof shed for the construction of Xianghe yuan station on subway line 17. The structure is a typical frame supported membrane structure. The enclosed contour is 80 meters long and 40 meters wide, with a total height of 22 meters. The membrane wall of the dustproof shed is started from 5.2 meters high, and the color plate is used below the elevation of 5.2 meters to seal it. There is a tunnel at the bottom of the wall. The membrane roof is divided into 7 independent membrane units, and the surrounding gable walls is divided into 20 independent membrane units. The largest expanded area of the membrane units is about 515 square metres.
竣工时间:2018年4月 Completion time: Apri. 2017
建设地点:北京 Construction site: Beijing
结构形式:骨架式 Structure form: Framework membrane structure
膜 面 积:6700平米 Membrane area: 6700 square meters
膜材型号:MC250P PVDF膜材 Membrane Material: MC250P PVDF