Project introduction
该工程属于整体张拉式膜结构体系,膜覆盖区域面积30米 x 24米,双轴对称结构,中间三根支撑钢柱为膜面提供提升吊点,钢柱最高点标高13.95米,两端标高10.75米,膜面四周边外拉8个角点,通过张拉脊索,边索和稳定索而成形。
Indonesia Palembang Membrane Structure
This project belongs to the tensile membrane structure. The coverage area is symmetrical structure of 30m x 24m. The three supporting steel columns provide lifting points to the membrane surface. The middle one has a 13.95m elevation, and the two side columns have the same elevation of 10.75m. The whole membrane surface is formed a tensioned structure system by ridge-cable, side- cable and stable-cable.
竣工时间:2009年9月 Completion time: Sep. 2009
建设地点:印度尼西亚 Construction site: Indonesia
结构形式:张拉式 Structure form: Tension structure
膜 面 积:670平米 Membrane area: 670 square meters